NW06, 07, 08 Wembley Park

NW 06 07 and 08 was split into two projects but my personal involvement across both was similar. These are again plots in the Wembley Park masterplan, both projects have more of a substantial public realm than E05 and comprise of green spaces, play areas and thoroughfares.
They are all residential blocks and NW06 has a large podium garden- detail challenges included the water feature and bleacher seats and managing VE requirements whilst maintaining a high quality design and delivery scheme. I was mostly involved in the drafting and detailing of drawings in this project.


NW 07 and 08 also came with detailing challenges of the water features in the public realm - a scope gap emerged at the last minute when we realised that the detail of the granite to the water feature had'nā€™t been designed - it fell to us to design something that we could retro-coordinate with structural engineers and MEP - it turned out well in the end.